Available for ImportHigh-Pressure Cylinder Assembly for T-50 Turbine - Improve Efficiency and Reliability
Manufacturer:UTZ OJSC
Price:Request Quote
Bulk pricing available
FOB, CIF & EXW terms available
Available Models
Complete cylinder SD-II (for turbine T-259/307-23,5)Cylinder SD-I complete (for turbine T-259/307-23,5)Steam inlet part of CND (for turbine T-80/100-12,8, Yakutskaya GRES-2, st.1, stock No.31804)Complete UA cylinder (for turbine T-259/307-23,5)Middle part of CND (for turbine T-80/100-12,8 Yakutskaya GRES-2, st.1, stock No.31804)
Description
Technical re-equipment of turbine T-50-130-1 consists in replacement of units and parts of the turbine, operating at high temperatures and exhausted resource, and includes the following types of works:
- replacement of the complete CVD;
- replacement of the blistered rotor of the turbine complete with GMN;
- replacement of the turbine control valve cam-valve distributor;
- replacement of control and stop valves;
- replacement of the front bearing assembly with the corresponding base frame and the support bearing shell (rear bearing of the VDC);
- replacement of the turbine pipework to the extent necessary to install the new supplied Equipment to replace the dismantled Equipment;
- replacement of turbine cladding.
- replacement of the complete CVD;
- replacement of the blistered rotor of the turbine complete with GMN;
- replacement of the turbine control valve cam-valve distributor;
- replacement of control and stop valves;
- replacement of the front bearing assembly with the corresponding base frame and the support bearing shell (rear bearing of the VDC);
- replacement of the turbine pipework to the extent necessary to install the new supplied Equipment to replace the dismantled Equipment;
- replacement of turbine cladding.
Specifications
Electrical power at maximum condensing mode
55
Electrical power maximum
65
Rated electrical power
SBVVBG
Maximum scope of modernization
replacement of resource assemblies and parts; operating at temperatures greater than 450°c. This allows for renewal of resource; and increases the rated; maximum condensing power and heat load.
Share your requirements for a quick response!
Instant response in 15 minutes
Best wholesale prices guaranteed
Direct from manufacturer
Delivery & Payment
Shipping Terms
Delivery Time
Sea freight: 30-60 days (depending on destination) Air freight: 14-21 days (for urgent orders)
Payment Methods
Similar Products You May Be Interested In
Front Seal CND for Turbine KE16.138.01.000
View DetailsSteam Turbine Diaphragm 21 Stages 36T230-2820
View DetailsHigh-Pressure Cylinder Assembly for PT-135 Turbine with Valves
View DetailsSteam Turbine Upgrade Kit K-215-130-1M3 for CND Block #9
View DetailsDiaphragm Sleeve for Steam Turbine Stators PS.100.125.02.000
View DetailsDiaphragm for Steam Turbine Cylinder Separation 48T230-3279
View DetailsHigh-Pressure Cylinder with Valve Block for K-800-23.5-5MR Turbine
View DetailsMedium Pressure Cylinder (CSD) with Valve Block for K-330-23.5-6MR Steam Turbine
View DetailsTurbine Support Bearing PS.100.303.01.000
View DetailsHigh-Pressure Cylinder Upgrade Kit for PT-60 Steam Turbine
View DetailsSteam Turbine Diaphragm for Internal Chamber Separation 48T230-3277
View DetailsSteam Turbine Modernization Kit T-100
View DetailsVerified Suppliers
All products are sourced directly from authorized Russian manufacturers
Quality Assurance
Products meet international quality standards with proper certification
Global Shipping
Reliable logistics solutions to deliver products to your location
Secure Payments
Multiple secure payment options to facilitate international transactions