
High-Pressure Cylinder Assembly for T-50 Turbine - Improve Efficiency and Reliability
Manufacturer:
UTZ OJSC
Price:
Request Quote
Bulk pricing available
FOB, CIF & EXW terms available
Available Models
Complete cylinder SD-II (for turbine T-259/307-23,5)
Cylinder SD-I complete (for turbine T-259/307-23,5)
Steam inlet part of CND (for turbine T-80/100-12,8, Yakutskaya GRES-2, st.1, stock No.31804)
Complete UA cylinder (for turbine T-259/307-23,5)
Middle part of CND (for turbine T-80/100-12,8 Yakutskaya GRES-2, st.1, stock No.31804)
Description
Technical re-equipment of turbine T-50-130-1 consists in replacement of units and parts of the turbine, operating at high temperatures and exhausted resource, and includes the following types of works:
- replacement of the complete CVD;
- replacement of the blistered rotor of the turbine complete with GMN;
- replacement of the turbine control valve cam-valve distributor;
- replacement of control and stop valves;
- replacement of the front bearing assembly with the corresponding base frame and the support bearing shell (rear bearing of the VDC);
- replacement of the turbine pipework to the extent necessary to install the new supplied Equipment to replace the dismantled Equipment;
- replacement of turbine cladding.
- replacement of the complete CVD;
- replacement of the blistered rotor of the turbine complete with GMN;
- replacement of the turbine control valve cam-valve distributor;
- replacement of control and stop valves;
- replacement of the front bearing assembly with the corresponding base frame and the support bearing shell (rear bearing of the VDC);
- replacement of the turbine pipework to the extent necessary to install the new supplied Equipment to replace the dismantled Equipment;
- replacement of turbine cladding.
Specifications
Electrical power at maximum condensing mode
55
Electrical power maximum
65
Rated electrical power
SBVVBG
Maximum scope of modernization
replacement of resource assemblies and parts; operating at temperatures greater than 450°c. This allows for renewal of resource; and increases the rated; maximum condensing power and heat load.
Share your requirements for a quick response!
Instant response in 15 minutes
Best wholesale prices guaranteed
Direct from manufacturer
Delivery & Payment
Shipping Terms
Delivery Time
Sea freight: 30-60 days (depending on destination)
Air freight: 14-21 days (for urgent orders)
Payment Methods
Similar Products You May Be Interested In

Left Guide Blade for 30 Steps 47T230-3243
View Details
Low Pressure Cylinder Upgrade Kit for K-210-130 Steam Turbine
View Details
Turbine Upgrade Kit for T-100/120-130-2 Model
View Details
Guide Ring PS200.1517298
View Details
Semi-Flexible Coupling with Fastening PС.100.201.05.000
View Details
High-Pressure Turbine Cylinder Assembly for T-100-130 Upgrade
View Details
High-Pressure Turbine Cylinder Assembly T-250 with Stop Valve
View Details
Steam Turbine Diaphragm Stage 29 47T230-3218
View Details
Steam Turbine Upgrade Parts K-210-130-3M4 for Primorskaya GRES Block No. 5
View Details
High-Pressure Cylinder for K-330-23.5-6MR Steam Turbine
View Details
Special Reverse Valve KOS 200-1M4
View Details
Guide Ring for Steam Flow Division PS200.1513691
View DetailsVerified Suppliers
All products are sourced directly from authorized Russian manufacturers
Quality Assurance
Products meet international quality standards with proper certification
Global Shipping
Reliable logistics solutions to deliver products to your location
Secure Payments
Multiple secure payment options to facilitate international transactions