
Rail-laying complex RU-700
Manufacturer:
Tulazheldormash OJSC im. A.V. Silkina
Price:
Request Quote
Bulk pricing available
FOB, CIF & EXW terms available
Available Models
Description
Performance of works on change of rail shoulders with their introduction into the optimum temperature interval of fixing and replacement of under-rail gaskets.
Rail-laying complex RU-700 is designed to perform works on changing of old rails or inventory rails assembled in the stubs to new rail stubs with their introduction into the optimal temperature interval of fixing or to the assembled rails with overlays and replacement of under-rail gaskets.
-Performance of a complex of track works on change of rail straps, under-rail pads and introduction of straps into the fixing temperature in one pass;
-Reduction of the number of personnel involved in carrying out the works
-Elimination of the human factor when carrying out the work on heating of the rail shoulders
-Fixing of key parameters of performed works in the machine memory
-Enhancement of work culture
Rail-laying complex RU-700 is designed to perform works on changing of old rails or inventory rails assembled in the stubs to new rail stubs with their introduction into the optimal temperature interval of fixing or to the assembled rails with overlays and replacement of under-rail gaskets.
-Performance of a complex of track works on change of rail straps, under-rail pads and introduction of straps into the fixing temperature in one pass;
-Reduction of the number of personnel involved in carrying out the works
-Elimination of the human factor when carrying out the work on heating of the rail shoulders
-Fixing of key parameters of performed works in the machine memory
-Enhancement of work culture
Specifications
Type of product according to PP RF 616
Machines for compaction, straightening, shoring and straightening of tracks
Productivity (speed of replacement of P65 rails with heating and change of under-rail gaskets)
700
Temperature difference of rail before and after heating
SBVVBG °C
Number of sections, pcs.
2 pcs
Speed during transportation in a train
80
Share your requirements for a quick response!
Instant response in 15 minutes
Best wholesale prices guaranteed
Direct from manufacturer
Delivery & Payment
Shipping Terms
Delivery Time
Sea freight: 30-60 days (depending on destination)
Air freight: 14-21 days (for urgent orders)
Payment Methods
Similar Products You May Be Interested In

Railway Straightening and Leveling Machine VPRS-03.2
View Details
Electric Vibratory Ballast Tamper SHPVE-2M
View Details
Universal Track Repair Machine MPRU(R) for Railway Maintenance
View Details
Ballast Stabilization and Finishing Machine VPO-C
View Details
Railway Track Straightening and Tamping Machine VPRS-02M
View Details
Universal Repair Track Machine MPRU
View Details
Hydraulic Rail Straightener RGU-4M
View Details
Primary Railway Alignment Machine MPV-2000
View Details
Portable Autonomous Sleeper Tamper with Diesel Drive SHPVD
View DetailsVerified Suppliers
All products are sourced directly from authorized Russian manufacturers
Quality Assurance
Products meet international quality standards with proper certification
Global Shipping
Reliable logistics solutions to deliver products to your location
Secure Payments
Multiple secure payment options to facilitate international transactions