Efficient Steam Separator and Superheater for High Pressure Systems

Steam Separator and Superheater for High Pressure Turbines - Enhance Thermal Efficiency

Manufacturer:ZIO-PODOLSK OJSC
Price:Request Quote

Bulk pricing available

FOB, CIF & EXW terms available

Description

Separators-steam superheaters are designed for installation in the system of separation and superheating of wet steam, serve for drying and superheating of wet steam after the high-pressure cylinder of the turbine unit.
Steam separators and superheaters are installed in the engine room of NPP.
Two-stage design: steam superheater of the 1st stage, steam superheater of the 2nd stage, separator, steam and condensate chambers of the 1st,2nd superheating stages, SPP separator.

Specifications

Steam consumption of tube space of 1st stage superheater steam superheater
88
Vapour temperature of the intertube space at the outlet of the 2nd stage superheater
5 MPa
Interstage vapour pressure at the outlet of the 2nd stage superheater
555 MPa
Vapour temperature of the intertube space at the outlet from the 1st stage superheater
B1/B8 2100/900 MHz °C
Interstage vapour pressure at the outlet of the 1st stage superheater
562 MPa
Temperature of wet vapour of intertube space at the SPP inlet
82 °C
Intertube vapour pressure at the inlet of the PPS
57 MPa
Flow rate of wet vapour of intertube space at SPP inlet
16
Constituent parts: separator, 1st stage superheater, 2nd stage superheater
1 pcs
Weight
243000 kg
Vapour temperature at the inlet to SPP (PP2)
5 °C
Steam pressure of tube space at the inlet to superheater 2 stage steam superheater
562 MPa
Steam consumption of superheater tube space of 2nd stage steam superheater
82
Steam temperature of pipe space at the inlet of SPP
73 °C
Tube space vapour pressure at the outlet of the 1st stage superheater 1216766:Tube space vapour pressure at the outlet of the 1s
633 MPa

Note: All specifications are provided by the manufacturer and may be subject to change. Please contact us to confirm the latest specifications before placing your order.

Save Your Time

Share your requirements for a quick response!

Instant response in 15 minutes
Best wholesale prices guaranteed
Direct from manufacturer

Delivery & Payment

Shipping Terms

FOB Novorossiysk, RussiaCIF Available to major ports worldwideEXW Manufacturer's facility, Russia

Delivery Time

Sea freight: 30-60 days (depending on destination) Air freight: 14-21 days (for urgent orders)

Payment Methods

Letter of Credit (L/C)Wire Transfer (T/T)Escrow Services

Similar Products You May Be Interested In

Verified Suppliers

All products are sourced directly from authorized Russian manufacturers

Quality Assurance

Products meet international quality standards with proper certification

Global Shipping

Reliable logistics solutions to deliver products to your location

Secure Payments

Multiple secure payment options to facilitate international transactions

Your callback request has been received. We'll contact you shortly.