
Wheel Pair for Load Support and Direction Control - Model 2.7175.31.10.011.13
Manufacturer:
OERVZ OJSC
Price:
Request Quote
Bulk pricing available
FOB, CIF & EXW terms available
Description
Purpose of wheelsets
Wheelsets are designed to take the load from the wagon, the direction of its movement on the rail track and are a link in their interaction.
Main technical characteristics of wheelsets
- design speed 90 km/h
- by wheel design - wheelsets with solid-rolled wheels
- weight of wheelset with solid rolled wheels 1400 kg
- wheel diameter along the rolling circle 780 mm
-distance between the inner faces of the wheels 1440 mm
-dimension between the end faces of the inspection covers 2406 mm
-gear ratio of the wheelset gearbox 5,33
-nominal diameter of wheelset axle journals 110 mm
-type of axlebox bearings -roller bearings
-highest static load on the axle 140 kN (14 tonnes)
method of connection between wheelsets and bogie - spindle-type
Wheelsets are designed to take the load from the wagon, the direction of its movement on the rail track and are a link in their interaction.
Main technical characteristics of wheelsets
- design speed 90 km/h
- by wheel design - wheelsets with solid-rolled wheels
- weight of wheelset with solid rolled wheels 1400 kg
- wheel diameter along the rolling circle 780 mm
-distance between the inner faces of the wheels 1440 mm
-dimension between the end faces of the inspection covers 2406 mm
-gear ratio of the wheelset gearbox 5,33
-nominal diameter of wheelset axle journals 110 mm
-type of axlebox bearings -roller bearings
-highest static load on the axle 140 kN (14 tonnes)
method of connection between wheelsets and bogie - spindle-type
Specifications
Type of product according to PP RF 616
Component spare parts) of subway cars, not having independent groupings
Type
absent
Weight
1.46 t
Length
2402 mm
Width
785 mm
Height
785 mm
Share your requirements for a quick response!
Instant response in 15 minutes
Best wholesale prices guaranteed
Direct from manufacturer
Delivery & Payment
Shipping Terms
Delivery Time
Sea freight: 30-60 days (depending on destination)
Air freight: 14-21 days (for urgent orders)
Payment Methods
Similar Products You May Be Interested In

Diagnostic Block BD-SP-775, Version 02
View Details
Power Supply Unit (UP-1) VITYA 408124 004
View Details
Railway Wheels and Wheel Centers for Freight and Passenger Cars, Locomotives, and Metro Trains
View Details
Train Onboard Device BUP-RA for Signal Reception and Control
View Details
Railway Headlight for Metro Rolling Stock FS.FPSM760.01
View Details
Mechanical Gasket for Subway Cars 17020 3612 027 00
View Details
UPR3 Processor Module (VITYA.408121.006-03)
View Details
Specialized Logical Processing Unit BUV-20 for Metro Trains
View Details
Wheelset for Metro Carriages - Enhance Mobility and Efficiency
View Details
Functional Software for SCIF-PM System
View Details
High-Speed Subway Door System for Metro Trains SUA05DM2M4-C31E02
View Details
Rotary Vane Compressor Unit AKR-7M-01 P U1
View DetailsVerified Suppliers
All products are sourced directly from authorized Russian manufacturers
Quality Assurance
Products meet international quality standards with proper certification
Global Shipping
Reliable logistics solutions to deliver products to your location
Secure Payments
Multiple secure payment options to facilitate international transactions