Reliable Gas Heating System Shut-off Valve PКО-029-80-04

Gas Heating System Shut-off Valve PКО-029-80-04 for Efficient Gas Distribution

Manufacturer:NTL LLC
Price:Request Quote

Bulk pricing available

FOB, CIF & EXW terms available

Description

PKO is designed for protection of boiler units in gas heating systems at gas distribution stations with the pressure of the coolant in the thermal circuit up to 0.9MPa and temperature up to 110 oÑ. CCPs are installed at the inlet and outlet of the gas heater and provide protection of the coolant circuit in case of gas heater depressurisation, preventing natural gas pressurised up to 12.5 MPa from entering the coolant circuit. During normal operation of the gas heating system, the coolant flows freely through the internal cavity of the valve.

When the pressure in the heat exchanger exceeds the valve setting pressure, irrespective of the pressure rise rate, the heat exchanger is cut off automatically, without the operator's participation, due to the energy of the flowing medium. After depressurisation of the heat exchanger, the CCP automatically returns to the initial state. In operation, the CCP does not require any work related to its disassembly.

Specifications

Operating medium
natural gas GOST 5542, natural gas 27577, water/water ethylene glycol solution
Weight
14 kg
Response pressure
customizable in consultation with the customer
Operating position of the CCP
arbitrary
Nominal pressure PN
125 kgf/cm2
Nominal diameter DN
80 mm
Operating temperature
+1...+50 degrees Celsius
Maximum medium temperature
110 degrees Celsius
Connection dimensions of instrumentation sockets according to GOST 9833 (seating for threaded connections)
M12x1.5
Connection flanges
80-160-11-1-D GOST 33259
Assigned service life including replacement of components with shorter service life
30 year
Service life before decommissioning (end of service life does not lead to termination of the CCP operation)
40 year
Gate tightness class GOST 9544
?
Hull steel grade
09G2S

Note: All specifications are provided by the manufacturer and may be subject to change. Please contact us to confirm the latest specifications before placing your order.

Save Your Time

Share your requirements for a quick response!

Instant response in 15 minutes
Best wholesale prices guaranteed
Direct from manufacturer

Delivery & Payment

Shipping Terms

FOB Novorossiysk, RussiaCIF Available to major ports worldwideEXW Manufacturer's facility, Russia

Delivery Time

Sea freight: 30-60 days (depending on destination) Air freight: 14-21 days (for urgent orders)

Payment Methods

Letter of Credit (L/C)Wire Transfer (T/T)Escrow Services

Similar Products You May Be Interested In

Verified Suppliers

All products are sourced directly from authorized Russian manufacturers

Quality Assurance

Products meet international quality standards with proper certification

Global Shipping

Reliable logistics solutions to deliver products to your location

Secure Payments

Multiple secure payment options to facilitate international transactions

Your callback request has been received. We'll contact you shortly.