
Gas turbine engine GTE-6RM
Manufacturer:
PJSC "ODK-SATURN"
Price:
Request Quote
Bulk pricing available
FOB, CIF & EXW terms available
Description
GTD-6RM and GTD-8RM are twin-shaft gas turbines for driving electric generators as part of thermal power plants of small and medium capacity (from 6 to 64 MW and above).
Design Features:
- 11-stage compressor
- tube-and-ring combustion chamber (12 flame tubes)
- 2-stage compressor turbine
- 4-stage power turbine
Benefits:
- high reliability of GTE-6/8RM is ensured by the reliability and operating experience of D-30KU/KP family aircraft engines
- total operating time of GTE-6/8RM in operation, as part of GTA and GTPP, is more than 3.5 million hours
- possibility of operation on different types of fuel: gaseous (natural gas, associated petroleum gas) and liquid (paraffin, diesel fuel)
- reduction of capital and operating costs due to unification of gas turbines GTD-6/8RM with aircraft engines D-30KU/KP.
Design Features:
- 11-stage compressor
- tube-and-ring combustion chamber (12 flame tubes)
- 2-stage compressor turbine
- 4-stage power turbine
Benefits:
- high reliability of GTE-6/8RM is ensured by the reliability and operating experience of D-30KU/KP family aircraft engines
- total operating time of GTE-6/8RM in operation, as part of GTA and GTPP, is more than 3.5 million hours
- possibility of operation on different types of fuel: gaseous (natural gas, associated petroleum gas) and liquid (paraffin, diesel fuel)
- reduction of capital and operating costs due to unification of gas turbines GTD-6/8RM with aircraft engines D-30KU/KP.
Specifications
Weight (on frame), t
5.62 t
Height, m
2.5 m
Width, m
2.3 m
Length, m
3.4 m
Gas flow rate at the outlet, kg/s
46.2
Gas outlet temperature, °C
460 °C
Fuel consumption (at nominal mode), kg/hour
1853
Fuel used
gas ; diesel
N of output shaft, rpm
3000
EFFICIENCY (ISO 2314), %
24.8 %
Capacity (ISO 2314), MW
6.38
Note: All specifications are provided by the manufacturer and may be subject to change. Please contact us to confirm the latest specifications before placing your order.
Share your requirements for a quick response!
Instant response in 15 minutes
Best wholesale prices guaranteed
Direct from manufacturer
Delivery & Payment
Shipping Terms
Delivery Time
Sea freight: 30-60 days (depending on destination)
Air freight: 14-21 days (for urgent orders)
Payment Methods
Similar Products You May Be Interested In

Gas Turbine Engine GD40TG - High Efficiency Performance
View Details
Gas Turbine Drive Unit NK-36ST by Kuznetsov
View Details
Gas Turbine Drive Installation NK-361 PAO "Kuznetsov
View Details
Gas Turbine Drive Unit GTU-25 P for Gas Industry Applications
View Details
Gas Turbine Engine GTE-10RM for Gas Compressors
View Details
Gas Turbine Engine GTD-10PME for Gas Compressors
View Details
Gas Transfer Unit GPA-10RM for Efficient Gas Transport
View Details
Gas Turbine Power Plant GTES-2.5
View Details
Gas Turbine Drive Unit GTD-4RM
View Details
Gas Turbine Unit GTA-10 GT
View Details
Gas Pumping Unit GPA-5.5
View Details
Gas Turbine Engine GTE-110M
View DetailsVerified Suppliers
All products are sourced directly from authorized Russian manufacturers
Quality Assurance
Products meet international quality standards with proper certification
Global Shipping
Reliable logistics solutions to deliver products to your location
Secure Payments
Multiple secure payment options to facilitate international transactions