LED Street Light for Outdoor Illumination - BSTZ Victory DKU 007-060DIM

LED Street Light BSTZ Victory DKU 007-060DIM for Outdoor Area Lighting

Manufacturer:BSTZ LLC
Price:Request Quote

Bulk pricing available

FOB, CIF & EXW terms available

Description

LED street LED luminaire BSTZ Pobeda DCU 007-060DIM with built-in EPK-03 is designed to illuminate adjacent territories, open areas, industrial areas, motorways and facades of buildings. The housing is made of aluminium alloy with anodised coating. GSLED 5050 LEDs are used as a light source. Secondary optics - group lens 173071 (2x6)-2pcs. The uniqueness of this product in its additional possibilities of application in ASUNO (Automated System of Outdoor Lighting Control) with the function of dimming, which allows to reduce power consumption in certain hours of the day.

Specifications

Type of product according to PP RF 616
Lighting fixtures and lighting fittings other than those included in other groupings
Protection class against electric current
1
ELECTRICAL PROTECTION CLASS. CURRENT PROTECTION CLASS (NUMERIC VALUE!!!!!!!)
1
Color rendering index (Ra)
80
Protection class against electric current.
1
Lower operating temperature value
-50 °C
Correlating color temperature (CCT)
3000...5000 K
IK code
9
Power factor
0.98
Power consumption, W
65 W
Type of supply current
permanent
Net weight
2.6 kg
Gross weight
2.8 kg
Length
420 mm
Width
122 mm
Height
175 mm
Housing material
Anodized aluminum
Upper operating temperature value
SBVVBG °C
Luminous flux, lm
9360 lm
Pulsation factor
1 %
Climatic version
UHL1
Type by installation location
Street

Note: All specifications are provided by the manufacturer and may be subject to change. Please contact us to confirm the latest specifications before placing your order.

Save Your Time

Share your requirements for a quick response!

Instant response in 15 minutes
Best wholesale prices guaranteed
Direct from manufacturer

Delivery & Payment

Shipping Terms

FOB Novorossiysk, RussiaCIF Available to major ports worldwideEXW Manufacturer's facility, Russia

Delivery Time

Sea freight: 30-60 days (depending on destination) Air freight: 14-21 days (for urgent orders)

Payment Methods

Letter of Credit (L/C)Wire Transfer (T/T)Escrow Services

Similar Products You May Be Interested In

Verified Suppliers

All products are sourced directly from authorized Russian manufacturers

Quality Assurance

Products meet international quality standards with proper certification

Global Shipping

Reliable logistics solutions to deliver products to your location

Secure Payments

Multiple secure payment options to facilitate international transactions

Your callback request has been received. We'll contact you shortly.