Advanced Microprocessor Signal Control System MPC-SM for Subways

Microprocessor-Based Signal and Switch Control System MPC-SM for Efficient Subway Operations

Manufacturer: STALENERGO LLC
Price: Request Quote

Bulk pricing available

FOB, CIF & EXW terms available

Description

The MPC-SM system is a functionally complete electrical centralisation system integrating microprocessor centralisation, interval regulation system based on TRC, lightning and switching overvoltage protection equipment and technological diagnostics and monitoring system. It has its own uninterruptible power supply equipment and equipment for linking with dispatch centralisation systems. Distinctive features: complete refusal from the use of relays of the 1st class; method of construction of the central computing module - computer with 1oo2D structure on the basis of FPGA; application of CAD allows to change the configuration of track development of the station; linkage with any relay and microprocessor systems, integration and linkage with dispatch centralisation systems, etc. upper level systems; built-in self-diagnostic system, protection against lightning and switching overvoltages; Euroconstructed design without the use of railway relays and stators.

Specifications

Type of control system
Centralised
Type of climatic version according to GOST 15150-69
UHL4
Resistance to climatic factors according to GOST 34012-2016
Protection class K1
Degree of protection by shell according to GOST 14254-2015 (IEC 60529:213)
IP30
Protection of person against electric shock according to GOST 12.2.007.0-075
Class 0I
Resistance to mechanical influences according to OST 32.146-200
Class MC1
Resistance to electromagnetic interference according to GOST R 33436.4-1-2015
Class I
Power supply
Two independent three-phase AC power supplies with isolated neutral and rated voltage 220 V(+5 %)/(-10 %) and mains frequency (50 1) Hz.
Time of full cycle of work
Not more than 0,5 s
Average MTBF
Not less than 50,000 h
Battery life
At least 120 min
Assigned service life
For internally mounted racks - not less than 25 years. For TEZ - not less than 15 years.

Note: All specifications are provided by the manufacturer and may be subject to change. Please contact us to confirm the latest specifications before placing your order.

Save Your Time

Share your requirements for a quick response!

Instant response in 15 minutes
Best wholesale prices guaranteed
Direct from manufacturer

Delivery & Payment

Shipping Terms

FOB Novorossiysk, Russia CIF Available to major ports worldwide EXW Manufacturer's facility, Russia

Delivery Time

Sea freight: 30-60 days (depending on destination) Air freight: 14-21 days (for urgent orders)

Payment Methods

Letter of Credit (L/C) Wire Transfer (T/T) Escrow Services

Similar Products You May Be Interested In

Verified Suppliers

All products are sourced directly from authorized Russian manufacturers

Quality Assurance

Products meet international quality standards with proper certification

Global Shipping

Reliable logistics solutions to deliver products to your location

Secure Payments

Multiple secure payment options to facilitate international transactions

Your callback request has been received. We'll contact you shortly.