
High-Pressure Cylinder Assembly for PT-135 Turbine - Enhance Performance
Manufacturer:
UTZ OJSC
Price:
Request Quote
Bulk pricing available
FOB, CIF & EXW terms available
Description
Modernisation consists in replacement of units and parts of the PT-135/165-130/15 turbine operating at high temperatures and exhausted resource, and includes the following types of works:
- replacement of the complete CVD with installation on the existing foundation and on the existing housing of the front bearing block and the middle (thrust bearing);
- replacement of DDC control valves and turbine stop valves with preservation of the single-line scheme of fresh steam supply to the stop valves;
- replacement of the cam-type distributor of the VDC control valves;
- replacement of the liners of the front support bearing and rear support bearing of the CVD;
- replacement of oil protection rings.
Designation of the turbine after Modernisation: PT-135/165-12,8/1,47 PR1.
- replacement of the complete CVD with installation on the existing foundation and on the existing housing of the front bearing block and the middle (thrust bearing);
- replacement of DDC control valves and turbine stop valves with preservation of the single-line scheme of fresh steam supply to the stop valves;
- replacement of the cam-type distributor of the VDC control valves;
- replacement of the liners of the front support bearing and rear support bearing of the CVD;
- replacement of oil protection rings.
Designation of the turbine after Modernisation: PT-135/165-12,8/1,47 PR1.
Specifications
Minimum scope of modernization
In the modernisation of PT-135 series turbine, the resource units and parts are replaced; operating at the temperature more than 450°C. This allows to renew the resource and improve the technical and economic performance.
Average volume of modernization
in addition to replacement of resource units and parts of the high-pressure cylinder, the liners of the front support bearing and the rear support bearing of the high-pressure cylinder and oil protection rings are also replaced
Share your requirements for a quick response!
Instant response in 15 minutes
Best wholesale prices guaranteed
Direct from manufacturer
Delivery & Payment
Shipping Terms
Delivery Time
Sea freight: 30-60 days (depending on destination)
Air freight: 14-21 days (for urgent orders)
Payment Methods
Similar Products You May Be Interested In

Guide Ring for Steam Flow Division PS200.1513691
View Details
Rear Sealing CNK for Turbine, Model KE16.139.01.000
View Details
Steam Turbine Diaphragm 21 Stages 36T230-2820
View Details
High-Pressure Cylinder with Valve Block for K-800-23.5-5MR Turbine
View Details
Steam Turbine Diaphragm 26 Stages 36T230-2821
View Details
Low-Pressure Cylinder Rotor for K-100 Turbine
View Details
High-Pressure Cylinder for Steam Turbine K-830-240-5M Set with Valves
View Details
Special Reverse Valve KOS 200-1M4
View Details
High-Pressure Cylinder Upgrade Kit for PT-60 Steam Turbine
View Details
Rear Bearing PS.100.314.00.000 for Turbines
View Details
Guide Ring for Steam Flow Division PS.100.125.01.000
View Details
Guide Ring PS200.1517298
View DetailsVerified Suppliers
All products are sourced directly from authorized Russian manufacturers
Quality Assurance
Products meet international quality standards with proper certification
Global Shipping
Reliable logistics solutions to deliver products to your location
Secure Payments
Multiple secure payment options to facilitate international transactions