
Steam Turbine Modernization Kit T-100 for Enhanced Efficiency
Manufacturer:UTZ OJSC
Price:Request Quote
Bulk pricing available
FOB, CIF & EXW terms available
Description
The set of products for modernisation of the T-100/120-130-2 turbine includes delivery of a new CVD with a one-stage regulating stage and nine pressure stages, as well as a number of other assemblies and parts, including a modernised camshaft distributor with a reinforced frame, modernised regulating and stop valves, thrust bearing with modernised thrust pads of increased bearing capacity, a new electrohydraulic regulation and protection system, etc.
The turbine modernisation provides:
- improvement of steam distribution operation;
- increased turbine efficiency due to optimisation of the flow section.
The turbine modernisation provides:
- improvement of steam distribution operation;
- increased turbine efficiency due to optimisation of the flow section.
Specifications
Minimum scope of modernization
modernisation of turbine of t-100 series replace resource nodes and parts operating at temperature more than 450°?. it allows to renew resource, and also to increase nominal, maximum power and heat load in condensing mode.
Average volume of modernization
In addition to replacement of resource components and parts of the high-pressure cylinder, additionally includes replacement of the flow part of the medium pressure, as well as bypass pipes from the high-pressure cylinder to the medium-pressure cylinder.
Maximum scope of modernization
In addition to the average variant, the low-pressure flow part is replaced, which makes it possible to increase the reliability of operation of the low-pressure part.
Share your requirements for a quick response!
Instant response in 15 minutes
Best wholesale prices guaranteed
Direct from manufacturer
Delivery & Payment
Shipping Terms
Delivery Time
Sea freight: 30-60 days (depending on destination) Air freight: 14-21 days (for urgent orders)
Payment Methods
Similar Products You May Be Interested In

Rigid Coupling with Fasteners for Steam Turbines PS.100.201.06.000
View Details
Diaphragm Sleeve PS.100.125.02.000
View Details
High-Pressure Cylinder Upgrade Kit for T-100 Steam Turbine
View Details
Steam Turbine Diaphragm for Internal Chamber Separation 48T230-3277
View Details
Steam Turbine Diaphragm 21 Stages 36T230-2820
View Details
High-Pressure Cylinder Upgrade Kit for PT-60 Steam Turbine
View Details
Semi-Flexible Coupling with Fastening PС.100.201.05.000
View Details
Turbine Diaphragm 25 Stages 47T230-3217
View Details
Rear Seal for Turbine Shaft CND KЭ16.139.02.000
View Details
Rear Bearing PS.100.314.00.000 for Turbines
View Details
High-Pressure Cylinder Assembly for T-50 Turbine with Stop Valve and Regulating Valves
View Details
Steam Turbine Coupling PS 200.1411580
View DetailsVerified Suppliers
All products are sourced directly from authorized Russian manufacturers
Quality Assurance
Products meet international quality standards with proper certification
Global Shipping
Reliable logistics solutions to deliver products to your location
Secure Payments
Multiple secure payment options to facilitate international transactions