High-Pressure Turbine Cylinder Assembly T-250 - Upgrade Parts

High-Pressure Turbine Cylinder Assembly T-250 for Enhanced Efficiency

Manufacturer: UTZ OJSC
Price: Request Quote

Bulk pricing available

FOB, CIF & EXW terms available

Description

The project of modernisation of turbine T-250/300-2400 provides for replacement of units and parts of the turbine operating at high temperatures and exhausted resource, and includes replacement of:
-WDC and CSD-I complete with installation on the existing foundation and new front bearing block and thrust bearing housings;
-Blocks of valves VD and SD with actuators with double steam inlets for connection to steam lines of boiler drum TPP-210A;
-block of the front bearing, support bearing assembly and rear support liner CSD-I;
-foundation frames under the housings of the front bearing block and thrust bearing;
-equipment of the turbine with electrohydromechanical ATS and turbine protection;
-equipping the drive turbine of the PTH with an electromechanical system of automatic regulation and protection with replacement of the actuators of the stop and control valves
equipping the turbine with ASKVM;
-replacement of ejectors, EOCs, oil protection rings and turbine cladding.
Designation of the turbine after Modernisation: T-250/300-23,5 PR1.

Specifications

Maximum scope of modernization
in addition to the medium variant, the low-pressure flow part is replaced; this allows to increase the reliability of the low-pressure part operation
Average volume of modernization
In addition to the replacement of high-pressure and medium-pressure cylinder resource units and parts; additionally includes the replacement of low-pressure flow section; and by-pass tubes from high-pressure cylinder to medium-pressure cylinder.
Minimum scope of modernization
Modernisation of T-250 series turbine replace service life units and parts; operating at temperatures above 450°C. This allows to renew the service life; and also to increase the nominal; maximum power and heat load in condensing mode.
Save Your Time

Share your requirements for a quick response!

Instant response in 15 minutes
Best wholesale prices guaranteed
Direct from manufacturer

Delivery & Payment

Shipping Terms

FOB Novorossiysk, Russia CIF Available to major ports worldwide EXW Manufacturer's facility, Russia

Delivery Time

Sea freight: 30-60 days (depending on destination) Air freight: 14-21 days (for urgent orders)

Payment Methods

Letter of Credit (L/C) Wire Transfer (T/T) Escrow Services

Similar Products You May Be Interested In

Verified Suppliers

All products are sourced directly from authorized Russian manufacturers

Quality Assurance

Products meet international quality standards with proper certification

Global Shipping

Reliable logistics solutions to deliver products to your location

Secure Payments

Multiple secure payment options to facilitate international transactions

Your callback request has been received. We'll contact you shortly.