
Part of water steam turbine T-121 high pressure
Manufacturer:
UTZ OJSC
Price:
Request Quote
Bulk pricing available
FOB, CIF & EXW terms available
Available Models
High-Pressure Cylinder Assembly for T-50 Turbine with Stop Valve and Regulating Valves
Complete cylinder SD-II (for turbine T-259/307-23,5)
Cylinder SD-I complete (for turbine T-259/307-23,5)
Steam inlet part of CND (for turbine T-80/100-12,8, Yakutskaya GRES-2, st.1, stock No.31804)
Complete UA cylinder (for turbine T-259/307-23,5)
Description
The project of modernisation of Turbine T-100-130 consists in replacement of units and parts of the turbine working at high temperatures and exhausted resource, and includes the following types of works:
- replacement of the complete CVD;
- replacement of camshaft distributor;
- replacement of stop and control valves;
- reconstruction of the front bearing unit assembly;
- replacement of the DDC flow assemblies, including new rotor SD and stator flanging;
- replacement of thrust bearing liners;
- replacement of the bearing liners of the SR rotor;
- replacement of two safety valves on the lower heating extraction pipeline with one safety valve;
- replacement of pipelines (with necessary fittings) of the turbine itself in the amount necessary for installation of new supplied equipment to replace the dismantled one;
- replacement of turbine cladding.
Designation of the turbine after modernisation T-121-12,8 PR2
- replacement of the complete CVD;
- replacement of camshaft distributor;
- replacement of stop and control valves;
- reconstruction of the front bearing unit assembly;
- replacement of the DDC flow assemblies, including new rotor SD and stator flanging;
- replacement of thrust bearing liners;
- replacement of the bearing liners of the SR rotor;
- replacement of two safety valves on the lower heating extraction pipeline with one safety valve;
- replacement of pipelines (with necessary fittings) of the turbine itself in the amount necessary for installation of new supplied equipment to replace the dismantled one;
- replacement of turbine cladding.
Designation of the turbine after modernisation T-121-12,8 PR2
Specifications
Maximum electrical power
121
Rated electrical power
121
Average volume of modernization
in addition to replacement of resource units and parts of the high-pressure cylinder; additionally includes replacement of the medium-pressure flow part.
Maximum scope of modernization
replacement of resource assemblies and parts; operating at temperatures greater than 450°c. This allows for renewal of resource; and increases the rated; maximum condensing power and heat load.
Share your requirements for a quick response!
Instant response in 15 minutes
Best wholesale prices guaranteed
Direct from manufacturer
Delivery & Payment
Shipping Terms
Delivery Time
Sea freight: 30-60 days (depending on destination)
Air freight: 14-21 days (for urgent orders)
Payment Methods
Similar Products You May Be Interested In

Steam Turbine Coupling PS 200.1411580
View Details
Turbine Support Bearing PS.100.303.01.000
View Details
Complete Upgrade Kit for CND K-210(215)-12.8 Turbine Block
View Details
Front Seal CND for Turbine KE16.138.01.000
View Details
Diaphragm Ring for CND Turbine K-200-130
View Details
Medium Pressure Cylinder (CSD) with SD Valve Block for K-330-23.5-8MR Steam Turbine
View Details
Semi-Flexible Coupling with Fastening PС.100.201.05.000
View Details
Low Pressure Cylinder Rotor CND Drawing 48T230-3275CBR
View Details
Diaphragm Sleeve PS.100.125.02.000
View Details
Steam Turbine Diaphragm for Chamber Separation 48T230-3278
View Details
Diaphragm Sleeve for Steam Turbine Stators PS.100.125.02.000
View Details
Steam Turbine Modernization Kit T-100
View DetailsVerified Suppliers
All products are sourced directly from authorized Russian manufacturers
Quality Assurance
Products meet international quality standards with proper certification
Global Shipping
Reliable logistics solutions to deliver products to your location
Secure Payments
Multiple secure payment options to facilitate international transactions